HYDRODYNAMIC SURVEY (PLT)


 

We perform hydrodynamic survey using the tool PLT-9.2 which is aimed to solve the following tasks:

- definition of the fluid movement profile;

- monitor net pay zone, annular fluid migration, well casing integrity, hydrodynamic reservoir characteristics;

- definition of the current coefficient of gas and oil saturation;

- definition of current flowrate (spinner flowmeter);

- estimation of current reservoir saturation (dual-spacing neutron extension tool).

 

PLT-9.2 records the following parameters:

- temperature;

- pressure;

- thermoconductive flowmeter;

- water content;

- resistivity;

- noise;

- mechanical flowmeter (spinner);

- casing collar locator;

- gamma ray;

- dual-spacing neutron tool (can be used as an extension of the tool).

 

 

Operational P-T conditions: 

MAX   MAX
120; 150; 175 °C   60; 80; 100 MPa

 

 

 



Addresses:

Office and Legal address:
37/1 Vasylia Tiutiunnyka St., 8th section, 3rd floor, apt.806, Pecherskyi dist, Kyiv,
03150, Ukraine

Production facility №1:
30 Shevchenko St., Tereshky, Poltavskyi dist, Poltava region
38761, Ukraine

Production facility №2:
21 Sanatorna St., Kreminna, Kreminskyi dist, Luhansk region
92904, Ukraine
Contacts:
Director
Oleg Stasiv
+38 (050) 475 31 09
boss@usg.email

Operations Director
Deputy

Stepan Yanush
+38 (050) 304 41 82
pl@usg.email

Chief Engineering Officer
Oleg Stasiv
+38 (095) 281 96 84
olegstasiv@usg.email

Principal Petrophysicist
Svitlana Tereb
+38 (050) 355 20 44
office@usg.email

Find Us on Facebook:


Share with colleagues: