DEFINING WELL CONSTRUCTION


Petrophysical survey carries out to define the exact location of different construction elements and hold-up depth using casing collar locator and gamma ray.

We are able to allocate the following construction elements:

- marker joint;

- tubing shoe;

- packer;

- flush connector;

- filter;

- perforation zones.

 


 

Operational P-T conditions: 

MAX   MAX
120; 150; 175 °C   60; 80; 100 MPa

 



Addresses:

Office and Legal address:
37/1 Vasylia Tiutiunnyka St., 8th section, 3rd floor, apt.806, Pecherskyi dist, Kyiv,
03150, Ukraine

Production facility №1:
30 Shevchenko St., Tereshky, Poltavskyi dist, Poltava region
38761, Ukraine

Production facility №2:
21 Sanatorna St., Kreminna, Kreminskyi dist, Luhansk region
92904, Ukraine
Contacts:
Director
Oleg Stasiv
+38 (050) 475 31 09
boss@usg.email

Operations Director
Deputy

Stepan Yanush
+38 (050) 304 41 82
pl@usg.email

Chief Engineering Officer
Oleg Stasiv
+38 (095) 281 96 84
olegstasiv@usg.email

Principal Petrophysicist
Svitlana Tereb
+38 (050) 355 20 44
office@usg.email

Find Us on Facebook:


Share with colleagues: